Full turnkey project for a new aluminum can manufacturing facility in Auckland, New Zealand, backed by some off New Zealand’s most prominent business men & women.
Crown Engineering Ltd provided the full package from Detailed Engineering, Equipment PDI checks at OEMs, Can Line Layout, Plant & Can-line Utilities Consumption data, and the full installation of a 2000cpm state of the art can-line.
COMPLETED – August 2024
EAST CAN SOLUTIONS, Tashkent, Uzbekistan.
A turnkey project for the 1st green field aluminum can manufacturing facility in Tashkent, Uzbekistan.
Crown Engineering Ltd provided Detailed Engineering, Utility requirements, PDI of equipment at OEM’s, Installation of 2 x 1800-3000cpm can-lines, Start-Up and Commissioning along with a full Training package and Operational support to the customer.
ONGOING Completion – 2025
BELVAC Europe
Pre-Engineering study for greenfield can-line & can-line layout design, utility consumption calculations and full project costings.
COMPLETED – 2022
Pakistan Aluminium Beverage (PABC)
Can-line speed up project, design and install equipment & implement systems to enable the customer to increase production from 2000cpm to 2800cpm.
COMPLETED – 2021
BELVAC Europe
Pre-Engineering study for greenfield can-line & can-line layout design, utility consumption calculations and full project costings.
COMPLETED – 2020
HELVETIA PACKAGING, Germany
Build & supply full can-line training package & Operational support.
COMPLETED – 2019
HELVETIA PACKAGING, Germany
Audit for existing can-line, re-design to enable improvements in production and overall efficiency.
COMPLETED – 2018
KACC, Tehran, Iran
Engineering drawings & Design package, Installation, Start-up and commissioning support for additional 2nd line.
COMPLETED – 2017
Pakistan Aluminium Beverage (PABC)
Assist PABC facility with accomplishing full certification awards from Coca Cola & Pepsi.
COMPLETED – 2017
Schuler Pressen
Crown Engineering Ltd provided Technical assistance to design and build prototype Bodymaker & Necker System.
COMPLETED – 2013
Kian Joo (KJM), Malaysia
Speed-Up of existing can-line, engineering design and drawings package, engineering support for Speed-Up
COMPLETED – 2011
Rongxin Brewery, China
Engineering design & drawings package, Engineering installation and commissioning for addition of 2nd can-line in existing plant.
COMPLETED – 2010
MEPAC, Baghdad, Iraq
Speed Up existing can-line from 2100cpm to 3500cpm with engineering and installation of 4 new Bodymakers across 2 existing can-lines.
COMPLETED – 2009
MEPAC, Baghdad, Iraq
Turnkey project to engineer and design 2 x can-lines and 2 x End-lines for new facility.
COMPLETED – 2008
CROWN Packaging, Seville, Spain
Installation of a 2000cpm can-line into existing plant.
COMPLETED – 2007
Consolidated Can Manufacturing (CCMC), Jeddah, Saudi Arabia
A full Turnkey greenfield project to engineer, design and provide 2 x 2000cpm can-lines to new facility.
COMPLETED – 2006
KACC, Tehran, Iran
A full turnkey greenfield project to engineer, provide and install 1 x 2000cpm can-line.